Description
During periods of cold climate it cannot be excluded that the temperature in the central area will drop to values below 0 degree C. This means that the water in the crushed rock backfill may freeze.
SKB Number
SKB FEP Number
CA02
Main Category
Main category for FEP
Internal process
System Component
System component to which the FEP applies
Central area
Handling
Explanation of how the FEP is treated
Intact canister, Resaturation/ "thermal" period: Neglected since this requires permafrost conditions.
Intact canister, Long-term after saturation and "thermal" period: Neglected due to small impact.
References
Bibliographic references to obtain more information
SR-Site Buffer, backfill and closure process report, TR-10-47, Section(s) 2.5.3, 6.1.2