Description
See FEP Ge24.
SKB Number
SKB FEP Number
CA19
Main Category
Main category for FEP
Internal process
System Component
System component to which the FEP applies
Central area
Handling
Explanation of how the FEP is treated
Failed canister, Resaturation/ "thermal" period: Assumed to be a part of the repository with high hydraulic conductivity (no failures are expected this period).
Failed canister, Long-term after saturation and "thermal" period: Assumed to be a part of the repository with high hydraulic conductivity .
References
Bibliographic references to obtain more information
SR-Site Buffer, backfill and closure process report, TR-10-47, Section(s) 2.5.3, 6.5.2