Computer Programs
PSR-0531 EEDB.
last modified: 05-JUN-2020 | catalog | categories | new | search |

PSR-0531 EEDB.

EEDB, The Energy Economic Data Base

top ]
1. NAME OR DESIGNATION

EEDB

top ]
2. COMPUTERS

To submit a request, click below on the link of the version you wish to order. Rules for end-users are available here.

Program name Package id Status Status date
EEDB PSR-0531/01 Arrived 05-JUN-2020

Machines used:

Package ID Orig. computer Test computer
PSR-0531/01 Many Computers
top ]
3. DESCRIPTION OR FUNCTION

The Energy Economics Data Base (EEDB) was developed by United Engineers & Constructors (now Washington Group International, Inc.) to provide representative, consistent electric power generating station technical and cost information to the U.S. Department of Energy (DOE). The database was first assembled in 1978 and was updated regularly for DOE from 1978 through 1990. Since 1991, Washington has maintained the data base on a private basis, as DOE discontinued funding at that time. The Data Base with its updates provides the only uniformly consistent historical record of U.S. Nuclear Power Plant costs in existence for use in analyzing cost trends, identifying future possibilities, and establishing a benchmark against which alternatives may be evaluated. This package contains nine documents cited below, which are related to EEDB.

top ]
4. METHODS

Not applicable.

top ]
5. RESTRICTIONS ON THE COMPLEXITY OF THE PROBLEM

None given.

top ]
6. TYPICAL RUNNING TIME

Not applicable.

top ]
9. STATUS
Package ID Status date Status
PSR-0531/01 05-JUN-2020 Masterfiled Arrived
top ]
10. REFERENCES
PSR-0531/01, included references:
- "The Energy Economic Data Base - Description and Use Experience," Washington
Group International.
- FCTD-#9057-v1 - "Nuclear Energy Cost Data Base, A Reference Data Base for
Nuclear and Coal-Fired Powerplant Power Generation Cost Analysis," DOE/NE-0095
(September 1988).
- FCTD-#9058-v1 - "Energy Economic Data Base (EEDB) - Phase IX Cost and
Regulation Date January 1, 1987. Complete Concise Printout for Model 184 - 1144
MWe Pressurized Water Reactor - PWR-BE (Best Experience Basis)."
- FCTD-#9059-v1 - "Energy Economic Data Base (EEDB) - Phase IX Cost and
Regulation Date January 1, 1987. Complete Pegasus Printout for Model 184 - 1144
MWe Pressurized Water Reactor - PWR-BE (Best Experience Basis)."
- FCTD-#9060-v1 - "Phase IX Update (1987) Report for the Energy Economic Data
Base Program EEDB - IX," DOE/NE-0091 (July 1988).
- FCTD-#9061-v1 - "Technical Reference Book for the Energy Economic Data Base
Program EEDB Phase IX," (1987), DOE/NE-0092, July 1988.
- J. J. Coen, H. I. Bowers, and M. L. Myers:
"Estimation of Nonfuel Operation and Maintenance Costs for Advanced Circulating
Fluidized-Bed and Advanced Natural Gas-Fired Combined Cycle Power Plants,"
ORNL/TM-11295, December 1989.
- H. I. Bowers, I. C. Fuller, and M. L. Myers:
"Cost Estimating Relationships for Nuclear Power Plant Operation and
Maintenance," ORNL/TM-10563 (November 1987).
- J. J. Coen and J. G. Delene:
"User Instructions for Levelized Power Generation Cost Codes Using an IBM-Type
PC," ORNL/TM-10997 (January 1989).
top ]
11. HARDWARE REQUIREMENTS

Any computer that can run Adobe Reader to view PDF files.

top ]
12. PROGRAMMING LANGUAGE(S) USED
No specified programming language
top ]
13. SOFTWARE REQUIREMENTS

No codes or electronic databases are provided with this package.

top ]
15. NAME AND ESTABLISHMENT OF AUTHORS

Contributed by: Radiation Safety Information Computational Center

                Oak Ridge National Laboratory, Oak Ridge, TN, USA

top ]
16. MATERIAL AVAILABLE
PSR-0531/01
nine PDF files of the referenced documents.
No software, database or executables are included with this package.
top ]
17. CATEGORIES
  • D. Depletion, Fuel Management, Cost Analysis, and Power Plant Economics

Keywords: cost analysis, database, economic analysis.