TIETHYS
Browse
Search
Back-office
Browse
Home
Browse
PWR
SB&MBLOCA
Small leak without HPIS overfeeding, secondary side necessary
No-phase
UMCP
Instability
SET Facilities
(fully or partially suitable for model validation)
Relevance
Rel.
CCVM
SET Facility
Description
100%
6.8
ESTA (Eighteen Degree Sector Test Apparatus) Toshiba
[6.8]
Description
100%
6.12
Guide Tube (CCFL Test Facilitv) Toshiba
[6.12]
Description
100%
12.1
HALDEN Reactor. Reflood Tests
[12.1]
Description
50%
10.20
Boiler Dynamics Rig
[10.20]
Description
50%
8.3
FRIGG/FROJA
[8.3]
Description
CFD Facilities
(fully or partially suitable for model validation)
No CFD facilities