Pilot Demonstration Tool

  The SCCRED Methodology developed by NINE

 

  The SCCRED Process to develop the Experimental Database

The LOFT Reference Data Set by SCCRED Ref.

The models used to describe the geometry of the LOFT facility is organized in several categories. All the components of the primary and secondary system are classified using a progressive numbering as follows:

·           100 – Pressure vessel and upper head

·           200 – Primary circuit: intact loop

·           300 – Primary circuit: broken loop

·           400 – Steam generator

·           500 – Suppression system

·           600 – Pressurizer and pressurizer surge line (Full Data Available)

·           700 – Reflood Assist Bypass System

·           800 – ECCS and Accumulators

Modules of the facility subdivision