| NEA/CNRA/R(2012)1 | WGOE Report: Maintaining and Transferring Knowledge on Operating Experience |
| NEA/CNRA/R(2012)2 | First Construction Experience Synthesis Report 2008-2011 |
| NEA/CNRA/R(2012)3 | Proceedings - Utilisation of Operating Experience in the Regulatory Inspection Programme and of Inspection Findings and Operating Experience Insights from the Non-Conformance of Spare Parts Working Group on Operating Experience - 14-16 June 2011 Helsinki, Finland
|
| NEA/CNRA/R(2012)3/ADD1 | Utilisation of Operating Experience in the Regulatory Inspection Programme and of Inspection Findings and Operating Experience Insights from the Non-Conformance of Spare Parts Working Group on Operating Experience Appendix: Compilation of Survey Responses 14-16 June 2011 Helsinki, Finland |
| NEA/CNRA/R(2012)5 | Challenges in Long-Term Operation of Nuclear Power Plants - Implications for Regulatory Bodies |
| NEA/CNRA/R(2012)6 | Proceedings of the 11th International Nuclear Regulatory Inspection Workshop on Experience from the Inspection of aging and equipment qualification, Inspection of competency of operators, and Inspection of licensees oversight of contractors - Baden, Switzerland, 21 24 May 2012
|
| NEA/CNRA/R(2012)6/ADD1 | 11th Workshop on Experience from the Inspection of Ageing and Equipment Qualification, of Competency of Operators and of Licensee's Oversight of Contractors - Appendix: Compilation of Survey Responses - Baden, Switzerland, 21-24 May 2012 |
| NEA/CNRA/R(2012)7 | Regulatory oversight of non-conforming, counterfeit, fraudulent and suspect items: final NCFSI Task Group Report |
| NEA/CNRA/R(2012)8 | Crisis Communication of Nuclear Regulatory Organisations: Towards global thinking |
| NEA/SEN/NRA/WGOE(2012)1 | Working Group on Operating Experience : Technical Note Status of National Actions in Response to the TEPCO Fukushima Dai-ichi Accident 17 June 2011 |
| NEA/CSNI/R(2012)1 | Proceedings of the OECD/NEA Workshop on Simulator Studies for HRA Purposes, Budapest, 4-6 November 2009 |
| NEA/CSNI/R(2012)2 | Workshop Proceedings on PSA for New and Advanced ReactorsOECD Conference Centre, June 20 - 24, 2011 Organized by the OECD/NEA WGRISK |
| NEA/CSNI/R(2012)3 | Nuclear Fuel Safety Criteria Technical Review
(Second Edition) |
| NEA/CSNI/R(2012)4 | OECD/NEA Workshop
Safety Assessment of Fuel Cycle Facilities - Regulatory Approches and Industry Perspectives |
| NEA/CSNI/R(2012)5 | OECD/SETH-2 PROJECT - Investigation of key issues for the simulation of thermal-hydraulic conditions in water reactor containment -
Final Summary Report
|
| NEA/CSNI/R(2012)6/VOL1 | International Standard Problem No.50 on ATLAS Volume 1 |
| NEA/CSNI/R(2012)6/VOL2 | International Standard Problem No.50 on ATLAS Volume 2 |
| NEA/CSNI/R(2012)6/VOL3 | International Standard Problem No.50 on ATLAS Volume 3 |
| NEA/CSNI/R(2012)7 | CSNI Technical Opinion Paper n° 15 - Ageing Management of Fuel Cycle Facilities |
| NEA/CSNI/R(2012)11 | Use and Development of Probabilistic Safety Assessment
An Overview of the situation at the end of 2010
|
| NEA/CSNI/R(2012)12 | Computer-Based Systems Important to Safety (COMPSIS) Project: Second Period of Operation (2008-2011) |
| NEA/CSNI/R(2012)13 | Oversight and Influencing of Leadership and Management for Safety, Including Safety Culture Proceedings of NEA/IAEA Workshop,Chester, UK, September 26-28 2011 |
| NEA/CSNI/R(2012)14 | OECD/NEA PRISME Project Application Report |
| NEA/CSNI/R(2012)15 | PSA KNOWLEDGE TRANSFER |
| NEA/CSNI/R(2012)16 | OECD-NEA Piping Failure Data Exchange Project (OECD-NEA OPDE) Report |
| NEA/CSNI/R(2012)17 | A Joint Report on PSA
for New and Advanced Reactors
2012. 5
|
| NEA/SEN/SIN/WGHOF(2012)1 | WGHOF Technical Note on Research in Human Factors for the Design and Operation of new NPP Technology
|