| NEA/CNRA/R(2006)1 | Joint CSNI/CNRA Report on Regulatory Uses of Safety Performance Indicators |
| NEA/CNRA/R(2006)2 | Committee on Nuclear Regulatory Activities Operating Plan 2006-2009
|
| NEA/CNRA/R(2006)3 | Operating Guidelines - June 2006 |
| NEA/CNRA/R(2006)4 | Loss of Residual Heat Removal (RHR)
While at Mid-Loop Conditions Corrective Actions |
| NEA/SEN/NRA/WGPC(2006)4 | PUBLICITY OF REGULATORS' DECISIONS |
| NEA/SEN/NRA/WGPC(2006)5 | PUBLIC COMMUNICATION DURING ABNORMAL SITUATIONS |
| NEA/CSNI/R(2006)1 | State-of-the-Art Report (SOAR) on Systematic Approaches to Safety Management |
| NEA/CSNI/R(2006)2 | BEMUSE Phase 2 Report: Re-Analysis of the ISP-13 Exercise, Post Test Analysis of the LOFT L2-5 Test Calculation |
| NEA/CSNI/R(2006)5 | Review of High Burn-up RIA and LOCA Database and Criteria |
| NEA/CSNI/R(2006)6 | Draft Pilot Report on Approaches to the Resolution of Safety Issues
|
| NEA/CSNI/R(2006)7 | Proceedings of the Workshop on Better Nuclear Plant Maintenance: Improving Human and Organisational Performance, Canada 3-5 October 2005 |
| NEA/CSNI/R(2006)8 | CSNI Integrity and Ageing Working Group Survey on Primary Water Stress Corrosion Cracking (PWSCC) and Nickel-based Alloy: Final Version September 2006 |