Index of unrestricted Nuclear Safety Technology and Regulation documents for 2002

NEA/CNRA/R(2002)1International Practices with Respect to Licence Periods/Terms for Nuclear Facilties in NEA Member Countries
NEA/CSNI/R(2002)1/VOL1Proceedings of the CNRA/CSNI Workshop on Licensing and Operating Experience of Computer-Based I&C Systems, Hluboka nad Vlatavou, Czech Republic, 25-27 September 2001 (Volume I)
NEA/CSNI/R(2002)1/VOL2Proceedings of the CNRA/CSNI Workshop on Licensing and Operating Experience of Computer-Based I&C Systems Hluboka nad Vlatavou, Czech Republic, 25-27 September 2001 (Volume II)
NEA/CSNI/R(2002)2Specialist Meeting on Safety Performance Indicators Proceedings, Madrid, Spain, October 17-19 2000
NEA/CSNI/R(2002)3Proceedings of the International Workshop Building the New HRA: Errors of Commission - From Research to Application, Rockville, Maryland, USA May 7-9 2001 Working Group on Risk Assessment (WGRisk)
NEA/CSNI/R(2002)4Summary and conlusions of the CNRA/CSNI Workshop on Licensing and Operating Experience of Computer-Based I & C Systems - Czech Republic 25-27 September 2001
NEA/CSNI/R(2002)6Knowledge Base for Strainer Clogging - Modifications performed in different countries since 1992
NEA/CSNI/R(2002)7/VOL1OECD-NEA Workshop on the Evaluation of Defects, Repair Criteria & Methods of Repair for Concrete Structures in Nuclear Power Plants - Berlin 10/11 April 2002 (Volume I)
NEA/CSNI/R(2002)7/VOL2OECD-NEA Workshop on the Evaluation of Defects, Repair Criteria & Methods of Repair for Concrete Structures in Nuclear Power Plants - Berlin 10/11 April 2002 (Volume II)
NEA/CSNI/R(2002)8Approaches to the Integration of Human Factors into the Upgrading and Refurbishment of Control Rooms: Workshop Proceedings, Halden, Norway, 23-25 August 1999
NEA/CSNI/R(2002)9Approaches to the Integration of Human Factors into the Upgrading and Refurbishment of Control Rooms - Summary and Conclusions of the Workshop, Halden, Norway, August 1999.
NEA/CSNI/R(2002)10Passive System Reliability - A Challenge to reliabillity engineering and licensing of advanced nuclear power plants - Proceedings of an international workshop hosted by the CEA 4-6 March 2002 Cadarache - France
NEA/CSNI/R(2002)11Severe Accident Management Operator Training and Instrumentation Capabilities, OECD/CSNI Workshop Summary and Conclusions, 12-14 March 2001, Lyon, France
NEA/CSNI/R(2002)12Implementation of Severe Accident Management Measures - Summary and Conclusions: OECD/CSNI Workshop, 10-13 September 2001, Villigen, Switzerland
NEA/CSNI/R(2002)13Finite element analysis of ageing reinforced and prestressed concrete structures in nuclear power plants - An international review of current capabilities and priorities for future developments
NEA/CSNI/R(2002)14Report of the task group reviewing activities in the area of ageing of concrete structures used to construct nuclear power plant fuel-cyle facilities
NEA/CSNI/R(2002)15Proceedings of an exploratory meeting of experts to define an action plan on best estimaye calculations and uncertainty analysis - Aix en provence - 13-14 May 2002
NEA/CSNI/R(2002)16Proceedings of an exploratory meeting of experts to define an action plan on the application of computational fluid dynamics (CFD) to nuclear reactor safety problems - Aix en provence - 15-16 May 2002
NEA/CSNI/R(2002)17Procedures for the initiation, cost-sharing and management of OECD projects in nuclear safety
NEA/CSNI/R(2002)18The Use and Development of Probabilistic Safety Assessment in NEA Member Countries
NEA/CSNI/R(2002)19ICDE Project report : Collection and analysis of the common-cause failure of safety valves and relief valves
NEA/CSNI/R(2002)20Workshop on the Regulatory Aspects of the Management of Change - Chester, UK, 10-12 September 2001: Summary and Conclusions
NEA/CSNI/R(2002)21Electrochemical techniques to detect corrosion in concrete structures in nuclear installations - Technical Note
NEA/CSNI/R(2002)22Lessons learnt from high magnitude earthquakes with respect to nuclear codes and standards
NEA/CSNI/R(2002)23ISP-45 (QUENCH 06 Test) - Final Comparison and Interpretation Report.
NEA/CSNI/R(2002)24Conclusions drawn from recent (2001-2002) events in Nuclear Power Plants - Technical Note
NEA/CSNI/R(2002)25Proceedings of the workshop "How to prevent Recurring Events more Effectively", 6-8 March 2002, Boettstein, Switzerland.
NEA/CSNI/R(2002)26Technical Aspects of Ageing for Long-term Operation
NEA/CSNI/R(2002)27OECD Lower Head Failure Project (1999-2002) Final Project Report OECD/NRC/NERI Performed at Sandia National Laboratories
NEA/SEN/SIN/FUEL(2002)2Summary Record of the Third Meeting of the Special Expert Group on Fuel Safety Margins - Aix-en-Provence, 13 May 2002