FIX-II/2032, BWR Pump Trip Experiment 2032, Simulation Mass Flow and Power Transients
FIX-II/3025, BWR FIX-II Pump Trip Experiment 3025, Immediate Split Size Break
FIX-II/3061, BWR FIX-II Pump Trip Experiment 3061, Large Split Break
FIX-II/5052, BWR FIX-II Pump Trip Experiment 5052, Guillotine Break Simulation
FIX-II/6261, BWR FIX-II Pump Trip Experiment 626, Transient Dryout Tests
FIX-II LOCA Blowdown and Pump Trip Heat Transfer Experiments, Summary report for phase 2: Description of Experimental Equipment, Part 1. Main Text (STUDSVIK/NR-83/238, February 1983)
FIX-II LOCA Blowdown and Pump Trip Heat Transfer Experiments, Summary report for phase 2: Description of Experimental Equipment, Part 2. Tables and figures (STUDSVIK/NR-83/238, February 1983)
FIX-II LOCA Blowdown and Pump Trip Heat Transfer Experiments, Summary report for phase 2: Description of Experimental Equipment, Part 3. Appendices (STUDSVIK/NR-83/238, February 1983)
FIX-II LOCA Blowdown and Pump Trip Heat Transfer Experiments, Topical report of phase 4: Results of Static dryout measurements in the 36-rod bundle (STUDSVIK/NR-83/274, 1983)
FIX-II LOCA Blowdown and Pump Trip Heat Transfer Experiments, Summary Report for the second experimental period (STUDSVIK/NR-85/42)
FIX-II Transient Dryout Tests, Summary Report (STUDSVIK/NP-86/35, March 1986)
ICAP, Assessment of RELAP5/MOD2, Cycle 36.04 against FIX-II Guillotine Break Experiment No 5061 (STUDSVIK/NP-86/109, October 1986)
Transfer of data from FIX-II experiments to OECD/NEA's Databank for the CSNI Code Validation Matrix (NS-92/58, September 1992)
Last reviewed: 11 July 2011