NEA-0581 TURBPLANT.

TURBPLANT, 1-D Steady-State Model of Power Reactor Steam Turbine Components

top ]
1. NAME OR DESIGNATION OF PROGRAM:  TURBPLANT.
top ]
2. COMPUTERS
To submit a request, click below on the link of the version you wish to order. Only liaison officers are authorised to submit online requests. Rules for requesters are available here.
Program name Package id Status Status date
TURBPLANT NEA-0581/01 Tested 09-JUL-1984

Machines used:

Package ID Orig. computer Test computer
NEA-0581/01 BURROUGHS 6700 IBM 3081
top ]
3. NATURE OF PHYSICAL PROBLEM SOLVED

TURBPLANT is a one-dimensional steady-state model of a high-pressure steam turbine, a low-pressure  steam turbine, a moisture separator, a reheater, a condensor, feedwater heaters and feedwater pump for a nuclear power plant.
top ]
4. METHOD OF SOLUTION

The energy equation and the mass equation are applied to every nozzle row and blade row in the turbine and iterated until convergency. The same equations are applied to the feedwater heaters and reheaters.
top ]
5. RESTRICTIONS ON THE COMPLEXITY OF THE PROBLEM

Max 36 turbine stages.
Max 10 feedwater heaters.
Max  2 reheaters.
top ]
6. TYPICAL RUNNING TIME:  Running time for sample problem is 110 secs.
NEA-0581/01
NEA-DB ran the two test cases on IBM 3081K. 5.44 CPU seconds were required for test case 1; 4.43 CPU seconds were required for test case 2.
top ]
7. UNUSUAL FEATURES: UNUSUAL FEATURES OF THE PROGRAM
top ]
8. RELATED OR AUXILIARY PROGRAMS: RELATED AND AUXILIARY PROGRAMS
NEA-0581/01
BWRPLANT/ZERO
ANDYCAP
top ]
9. STATUS
Package ID Status date Status
NEA-0581/01 09-JUL-1984 Tested at NEADB
top ]
10. REFERENCES
NEA-0581/01, included references:
- Erik Nonbol:
  Users Manual to the Program "TURBPLANT"
  DYN-1-75 (20 August 1975)
- Erik Nonbol:
  Development of a Dynamic Model of a BWR Nuclear Power Plant
  Part I: The Steady-State Model
  Riso Report No. 335 (December 1975)
- Erik Nonbol:
  Development of a Dynamic Model of a BWR Nuclear Power Plant
  Part II: The Dynamic Model
  Riso Report No. 336 (December 1975)
top ]
11. HARDWARE REQUIREMENTS: MACHINE REQUIREMENTS
NEA-0581/01
To execute the test cases on IBM 3081K, main storage requirements are 136K bytes for test case 1 and 128K bytes for test  case 2.
top ]
12. PROGRAMMING LANGUAGE(S) USED
Package ID Computer language
NEA-0581/01 FORTRAN-IV
top ]
13. OPERATING SYSTEM OR MONITOR UNDER WHICH PROGRAM IS EXECUTED:  MVS-SP (IBM 3081K).
top ]
14. OTHER PROGRAMMING OR OPERATING INFORMATION OR RESTRICTIONS

ANY OTHER PROGRAMMING OR OPERATING INFORMATION OR RESTRICTIONS
top ]
15. NAME AND ESTABLISHMENT OF AUTHOR

     E. Nonboel
     Dept. of Reactor Technology
     Risoe National Laboratory
     DK-4000 Roskilde, Denmark
top ]
16. MATERIAL AVAILABLE
NEA-0581/01
File name File description Records
NEA0581_01.002 TURBPLANT INFORMATION 95
NEA0581_01.004 TURBPLANT SOURCE (CARD-IMAGES) 3497
NEA0581_01.005 TURBPLANT SOURCE (FOR IEBUPDTE) 3524
NEA0581_01.006 TURBPLANT JCL 50
NEA0581_01.007 TURBPLANT INPUT DATA FOR TEST CASE 1 133
NEA0581_01.008 TURBPLANT INPUT DATA FOR TEST CASE 2 161
NEA0581_01.009 TURBPLANT PRINTED OUTPUT OF TEST CASE 1 824
NEA0581_01.010 TURBPLANT PUNCHED CARD OUTPUT OF TEST CASE1 28
NEA0581_01.011 TURBPLANT PRINTED OUTPUT OF TEST CASE 2 824
top ]
17. CATEGORIES
  • H. Heat Transfer and Fluid Flow

Keywords: BWR reactors, iterative methods, nuclear power plants, one-dimensional, power plants, pumps, steady-state conditions, steam turbines.