NEA/CNRA/R(2023)7Proceedings of the Special International Nuclear Regulatory Inspection Workshop on Challenges Related to Nuclear Power Plant Ageing Management, Graded Approach to Optimise the Inspection Process and the Effects of the COVID-19 Pandemic on Inspection Programmes and Practices
NEA/CNRA/R(2023)6WGSLC Document on Leadership for Safety: Practices for Enhancing Leadership for Safety in Nuclear Regulatory Bodies
NEA/CNRA/R(2023)5WGSLC Report on the Mutual Impact of Nuclear Regulatory Bodies and License Holders from a Safety Culture Perspective
NEA/CNRA/R(2023)4Proceedings of the In-Service Inspection Workshop (Working Group on Codes and Standards)
NEA/CNRA/R(2023)3Consensus position on the qualification of existing and new material manufacturing techniques within codes and standards
NEA/CNRA/R(2023)2The WGRNR report Engagement Frameworks and Performance Measures during the Application Assessment Phase of a License for Construction of a New Nuclear Project
NEA/CNRA/R(2023)1The Working Group on the Safety of Advanced Reactors (WGSAR) report: Common Regulatory Practices to Ensure Appropriate Qualification and Through-Life Performance of Materials in Advanced Reactors
NEA/CNRA/R(2022)5BWR Reactor Water Level Measurement
NEA/CNRA/R(2022)4Regulation of Corporate Governance for Nuclear Safety
NEA/CNRA/R(2022)3Regulatory Inspections of Digital Instrumentation and Control (I&C) Systems and Components Important to Safety used at Nuclear Power Plants
NEA/CNRA/R(2022)2BWR Severe Accident Mitigation Guidelines (SAMG) Information Compilation and Reactor Water Level Measurement
NEA/CNRA/R(2022)1Report on the survey of the Regulatory Approach on the Oversight of New Nuclear Power Plant Construction
NEA/CNRA/R(2021)2Consensus Position on the Impact of Cyber Security Features on Digital I&C Systems Important to Safety at Nuclear Power Plants [CP-08]
NEA/CNRA/R(2021)1Third Construction Experience Synthesis Report
NEA/CNRA/R(2020)3Proceedings of the Special International Nuclear Regulatory Inspection Workshop on Digital Instrumentation & Control (DI&C) 9-13 June 2019, Toronto, Canada
NEA/CNRA/R(2020)2Working Group on the Regulation of New Reactors (WGRNR) Interface of Safety and Security - Summary Report
NEA/CNRA/R(2020)1Summary Report on Licensing Process of New Reactor Applications
NEA/CNRA/R(2019)5The Evolving Use of Social Media as a Communication Tool by Nuclear Regulatory Organisations
NEA/CNRA/R(2019)4Working Group on Public Communication of Nuclear Regulatory Organisations - A Public Communication Case Study: Switzerland
NEA/CNRA/R(2019)32018 CNRA-MDEP Workshop on Nuclear Supply Chain Management Proceedings
NEA/CNRA/R(2019)2Regulatory Perspectives on Safety Aspects Related to Advanced Sodium Fast Reactors Part 4. Fuel Qualification for Sodium Fast Reactors (SFRs)
NEA/CNRA/R(2019)1Regulatory Perspectives on Safety Aspects Related to Advanced Sodium Fast Reactors: Part 2. Neutronics and Criticality Safety of Sodium Fast Reactors (SFRs)
NEA/CNRA/R(2018)614th WGIP Workshop Proceedings, Heidelberg, Germany 9-12 April 2018
NEA/CNRA/R(2018)6/ADD114th WGIP Workshop Proceedings, Heidelberg, Germany 9-12 April 2018 Questionnaires’anwers
NEA/CNRA/R(2018)5International Workshop on Operating Experience (OPEX) Proceedings Working Group on Operating Experience (WGOE) 24-26 April 2017, organised in co-operation with Consejo de Seguridad Nuclear (CSN), Madrid, Spain
NEA/CNRA/R(2018)4Consensus Position on the Impact of Cyber Security Features on Digital I&C Safety Systems [CP-08]
NEA/CNRA/R(2018)3Consensus Position on the Qualification of I&C Platforms for Use in Systems Important to Safety [CP-14]
NEA/CNRA/R(2018)2Consensus Position on Data Communication Independence [CP-04]
NEA/CNRA/R(2018)1Regulatory Perspectives on Safety Aspects Related to Advanced Sodium Fast Reactors Part 1. Severe Accident Prevention and Mitigation Measures in Sodium Fast Reactors (SFRs) Technical Report of the CNRA Working Group on the Safety of Advanced Reactors
NEA/CNRA/R(2017)8Regulatory Oversight of the Commissioning Phase for New Nuclear Reactors: Proceedings of the Joint CNRA WGRNR/MDEP Workshop Republic of Korea 14-16 March 2016
NEA/CNRA/R(2017)7A Comprehensive Report on Three Regional Stakeholder Workshops in Europe, North America and Asia
NEA/CNRA/R(2017)6Nuclear Regulatory Organisations' Oversight of New Licensee Organisational Capability - Workshop Proceedings, Chester, United Kingdom, March 2017
NEA/CNRA/R(2017)6/ADD1Nuclear Regulatory Organisations' Oversight of New Licensee Organisational Capability - Workshop Proceedings, Chester, United Kingdom, March 2017 - Appendices
NEA/CNRA/R(2017)5CNRA Operating Plan and Guidelines 2017-2022 Strategic Plan
NEA/CNRA/R(2017)5/REV2Operating Plan and Guidelines for the Nuclear Energy Agency Committee on Nuclear Regulatory Activities: 2017-2022
NEA/CNRA/R(2017)5/REV1CNRA Operating Plan and Guidelines 2017-2022
NEA/CNRA/R(2017)4Operational Experience from Heavy Load Incidents
NEA/CNRA/R(2017)3Report on the Survey of the Regulatory Practice to Assess Passive Safety Systems Used in New Nuclear Power Plant Designs First Stage Report
NEA/CNRA/R(2017)2Report on the Survey of the Design Review of New Reactor Applications - Volume 5: Classification of Structures, Systems, and Components
NEA/CNRA/R(2017)1First Triennial Report of the WGIP Benchmarking on Inspection Practices
NEA/CNRA/R(2016)3Report on the Survey of the Design Review of New Reactor Applications - Volume 4: Reactor Coolant and Associated Systems
NEA/CNRA/R(2016)213th International Nuclear Regulatory Inspection Workshop
NEA/CNRA/R(2016)2/ADD113th International Nuclear Regulatory Inspection Workshop + Appendix
NEA/CNRA/R(2016)1Report on the Survey of the Design Review of New Reactor Applications - Volume 3: Reactor
NEA/CNRA/R(2015)8Challenges and Enhancements to the Safety Culture of the Regulatory Body - A CNRA/CSNI/CRPPH Workshop
NEA/CNRA/R(2015)7Operating Experience Programme Effectiveness Measures - Workshop Proceeding - Garching, Germany, September 8-10, 2014
NEA/CNRA/R(2015)6The Role of the Inspector during an Emergency - Addendum to the Inspection of Emergency Arrangements [NEA/CNRA/R(2013)2]
NEA/CNRA/R(2015)5Report on the Survey of the Design Review of New Reactor Applications - Volume 2: Civil Engineering Works and Structures
NEA/CNRA/R(2015)4Second Construction Experience Synthesis Report 2011-2014 - Working Group on the Regulation of New Reactors (WGRNR)
NEA/CNRA/R(2015)3Report on the Construction Oversight Survey - Working Group on the Regulation of New Reactors
NEA/CNRA/R(2015)2Nuclear Regulatory Organisations and Communication Strategies
NEA/CNRA/R(2015)1Update on the Use of International Operating Experience Feedback for Improving Nuclear Safety
NEA/CNRA/R(2014)812th Workshop on Experience from the Inspection of Licensee's Outage Activities Including Fire Protection Programmes, Event Response Inspections, and the Impact on Inspection Programmes of the Fukushima Daiichi NPP Accident - Workshop Proceedings - Chattanooga, Tennessee, USA, 7-10 April 2014
NEA/CNRA/R(2014)8/ADD1Twelfth International Nuclear Regulatory Inspection Workshop on Experience from the Inspection of Licensees' Outage Activities, Including Fire Protection Programmes and Event Response Inspections, and the Impact of the Fukushima Daiichi NPP Accident on Inspection Programmes - Appendix of Responses - Chattanooga, Tennessee, USA, 7-10 April 2014
NEA/CNRA/R(2014)7Report on the Survey of the Design Review of New Reactor Applications - Volume 1: Instrumentation and Control Volume 1 Instrumentation and Control
NEA/CNRA/R(2014)6Nuclear Regulatory Organisations, the Internet and Social Media: The What, How and Why of Their Use as Communication Tools
NEA/CNRA/R(2014)5Supplementary Report on the Regulation of Site Selection and Preparation
NEA/CNRA/R(2014)4NEA/CNRA/CSNI Joint Workshop on Challenges and Enhancements to Defence in Depth (DiD) in Light of the Fukushima Daiichi NPP Accident
NEA/CNRA/R(2014)3Green booklet on Characteristics of an Effective Regulator
NEA/CNRA/R(2014)2ACCIDENT MANAGEMENT INSIGHTS AFTER THE FUKUSHIMA DAIICHI NPP ACCIDENT Report of the CNRA Task Group on Accident Management
NEA/CNRA/R(2014)1WGOE Report on Fukushima Daiichi NPP Precursor Events
NEA/CNRA/R(2013)3Proceedings of the 2nd CNRA Workshop on "New Reactor Siting, Licensing and Construction Experience", hosted by the US Nuclear Regulatory Commission, Atlanta, Georgia, USA, 24-26 October 2012
NEA/CNRA/R(2013)2INSPECTION OF EMERGENCY ARRANGEMENTS
NEA/CNRA/R(2013)1Inspection of Licensee - Maintenance Programme and Activities
NEA/CNRA/R(2012)8Crisis Communication of Nuclear Regulatory Organisations: Towards global thinking
NEA/CNRA/R(2012)7Regulatory oversight of non-conforming, counterfeit, fraudulent and suspect items: final NCFSI Task Group Report
NEA/CNRA/R(2012)6Proceedings of the 11th International Nuclear Regulatory Inspection Workshop on Experience from the Inspection of aging and equipment qualification, Inspection of competency of operators, and Inspection of licensee’s oversight of contractors - Baden, Switzerland, 21 – 24 May 2012
NEA/CNRA/R(2012)6/ADD111th Workshop on Experience from the Inspection of Ageing and Equipment Qualification, of Competency of Operators and of Licensee's Oversight of Contractors - Appendix: Compilation of Survey Responses - Baden, Switzerland, 21-24 May 2012
NEA/CNRA/R(2012)5Challenges in Long-Term Operation of Nuclear Power Plants - Implications for Regulatory Bodies
NEA/CNRA/R(2012)3Proceedings - Utilisation of Operating Experience in the Regulatory Inspection Programme and of Inspection Findings and Operating Experience Insights from the Non-Conformance of Spare Parts Working Group on Operating Experience - 14-16 June 2011 Helsinki, Finland
NEA/CNRA/R(2012)3/ADD1Utilisation of Operating Experience in the Regulatory Inspection Programme and of Inspection Findings and Operating Experience Insights from the Non-Conformance of Spare Parts Working Group on Operating Experience Appendix: Compilation of Survey Responses 14-16 June 2011 Helsinki, Finland
NEA/CNRA/R(2012)2First Construction Experience Synthesis Report 2008-2011
NEA/CNRA/R(2012)1WGOE Report: Maintaining and Transferring Knowledge on Operating Experience
NEA/CNRA/R(2011)13Report on the Survey of the Review of New Reactor Applications
NEA/CNRA/R(2011)12NEA Forum on the Fukushima Accident:Insight and Approaches - Forum Proceedings, Paris, France, 8 June 2011
NEA/CNRA/R(2011)11Road Map for Crisis Communication of Nuclear Regulatory Organisations – National Aspects
NEA/CNRA/R(2011)10Improving Nuclear Regulation - Volumes 1 to 14
NEA/CNRA/R(2011)9Operating Experience Report: Counterfeit, Suspect and Fraudulent Items (CSFI)
NEA/CNRA/R(2011)8Status of Country Regulatory Response to the Forsmark-1 Event 25 July 2006 and CSNI DiDELSYS Task Group Report Recommendations
NEA/CNRA/R(2011)7Workshop on "New Reactor Siting, Licensing and Construction Experience" - Workshop proceedings, 15-17 Sept. 2010, Prague, Czech Republic
NEA/CNRA/R(2011)6Operating Experience Report: Recent Failures of Large Oil-Filled Transformers
NEA/CNRA/R(2011)5Operating Experience Report: Investigating Trending Utilising the International Database
NEA/CNRA/R(2011)4The Regulator’s Role in Assessing the Licensee’s Oversight of Vendor and Other Contracted Services
Also referenced as: NEA No. 6910
NEA/CNRA/R(2011)3Commendable Practices on Transparency in Nuclear Regulatory Communication with the Public
NEA/CNRA/R(2011)2CNRA Operating Plan (2011-2016)
NEA/CNRA/R(2011)1Joint CSNI/CNRA Strategic Plan - 2011-2016
NEA/CNRA/R(2011)1/REV1Joint CSNI/CNRA Strategic Plan and Mandates - 2011-2016
NEA/CNRA/R(2010)8Not issued
NEA/CNRA/R(2010)7Inspection of Licensee Corrective Action Programme
NEA/CNRA/R(2010)610th International Nuclear Regulatory Inspection Workshop on Effectiveness of Regulatory Inspections, Inspection of Licensee Safety Culture, and Inspection of Licensee Safety Management System - Appendix
NEA/CNRA/R(2010)510th International Nuclear Regulatory Inspection Workshop on Effectiveness of Regulatory Inspections, Inspection of Licensee Safety Culture, and Inspection of Licensee Safety Management System - Workshop Proceedings
NEA/CNRA/R(2010)4Not issued
NEA/CNRA/R(2010)3CNRA - WGRNR - Report on the Survey on Regulation of Site Selection and Preparation
NEA/CNRA/R(2010)29th International Nuclear Regulatory Inspection Workshop on Training and Qualifying of Inspectors, Integration of Inspection Findings, and Inspections of New Plants Under Construction - Appendix : Compilation of Survey Responses - Porvoo, Finland 1st – 5th June, 2008
NEA/CNRA/R(2010)1Proceedings of the 9th International Nuclear Regulatory Inspection Workshop on Training and Qualifying of Inspectors, Integration of Inspection Findings, and Inspections of New Plants Under Construction - Porvoo, Finland 1st – 5th June, 2008
NEA/CNRA/R(2009)3CNRA Summary Report on Operating Experience Feedback Related to Fire Events and Fire Protection Programmes (Safety Analysis of Fire Operating Events)
NEA/CNRA/R(2009)2Current Status of the National Operating Experience Feedback Programs
NEA/CNRA/R(2009)1Committee on Nuclear Regulatory Activities (CNRA) Working Group on Inspection Practices (WGIP) Fire Inspection Programmes
NEA/CNRA/R(2008)6Inspection of Digital I&C Systems - Methods and Approaches: Proceedings of a CNRA Workshop, Garching, Germany 24-26 September 2007
NEA/CNRA/R(2008)5Committee on Nuclear Regulatory Activities: A Historical Perspective(1989 – 2008)
Also referenced as: Updates and Replaces NEA/CNRA/R(2004)2
NEA/CNRA/R(2008)4Achievements and Challenges in Nuclear Regulatory Communication with the Public: Outcome from the CNRA Workshops held in 2000, 2004 and 2007
NEA/CNRA/R(2008)3The Use of International Operating Experience Feedback for Improving Nuclear Safety
NEA/CNRA/R(2008)2CNRA Operating Plan (2006-2009)
Also referenced as: Updates andReplaces NEA/CNRA/R(2006)2
NEA/CNRA/R(2008)1CNRA Operating Guidelines
Also referenced as: Updates and replaces NEA/CNRA/R(2006)3
NEA/CNRA/R(2007)2Appendix – Compilation of Survey Responses from the 8th International Nuclear Regulatory Inspection Workshop on How Regulatory Inspections can Promote, or not Promote, Good Safety Culture, Inspection of Interactions Between the Licensee and its Contractors, and Future Challenges for Inspectors, New Techniques, Developing Competences, etc. Workshop held on 1–3 May 2006, in Toronto, Canada.
NEA/CNRA/R(2007)1Proceedings of the 8th International Nuclear Regulatory Inspection Workshop on How International Nuclear Regulatory Inspections Can Promote, Or Not Promote, Good Safety Culture, Inspection of Interactions Between the Licensee and its Contractors and Future Challenges for Inspectors (e.g. new techniques, developing competence, etc.) held on 1–3 May, 2006 in Toronto, Canada
NEA/CNRA/R(2006)4Loss of Residual Heat Removal (RHR) While at Mid-Loop Conditions Corrective Actions
NEA/CNRA/R(2006)3Operating Guidelines - June 2006
NEA/CNRA/R(2006)2Committee on Nuclear Regulatory Activities Operating Plan 2006-2009
NEA/CNRA/R(2006)1Joint CSNI/CNRA Report on Regulatory Uses of Safety Performance Indicators
NEA/CNRA/R(2005)5International Workshop on Risk Informed Inspection,Inspection of Performance of Licensee Organisation, and Inspection Aspects of Plant Near or at End-of-Life - Appendix: Compilation of Survey Responses
NEA/CNRA/R(2005)4Proceedings from International Workshop on Risk Informed Inspection,Inspection of Performance of Licensee Organisation, and Inspection Aspects of Plant Near or at End-of-Life, Fekete-Hegy (near Budapest), Hungary, 26 to 29 April, 2004, Hosted by the Hungarian Atomic Energy Authority (HAEA)
NEA/CNRA/R(2005)3Summary and Conclusions of the Joint CNRA/CSNI Workshop on the regulatory uses of safety performance indicators, Granada, Spain, 12-14 May 2004.
NEA/CNRA/R(2005)2Proceedings of the Joint CNRA/CSNI Workshop on the regulatory uses of safety performance indicators, Granada, Spain, 12-14 May 2004.
NEA/CNRA/R(2005)1CNRA Working Group on Inspection Practices (WGIP) Regulatory Inspection practices to bring about compliance - Report on a WGIP questionnaire
NEA/CNRA/R(2004)2Committee on Nuclear Regulatory Activities: A Historical Perspective (1989 - 2004)
NEA/CNRA/R(2004)1WGIP - Comparison of Inspection Practices of Research Reactors in Relation to the Practices Carried Out at Nuclear Power Plants
NEA/CNRA/R(2003)4CNRA - Nuclear Regulatory Inspection of Contracted Work Survey Results - Working Group on Inspection Practices
NEA/CNRA/R(2003)3Working Group on Inspection Practices - Inspection of Fuel Cycle Facilities in NEA member countries, March 2003
NEA/CNRA/R(2003)2Appendix (Survey responses) to the proceedings of the workshop on regulatory inspection activities related to inspection of events and incidents, inspection of internal and external hazards, and inspection activities related to challenges arising from competition in the electricity market held in Veracruz, Mexico, 28 April-2 May 2002
NEA/CNRA/R(2003)1Proceedings of the workshop on regulatory inspection activities related to inspection of events and incidents, inspection of internal and external hazards, and inspection activities related to challenges arising from competition in the electricity market, held in Veracruz, Mexico, 28 April-2 May 2002
NEA/CNRA/R(2002)1International Practices with Respect to Licence Periods/Terms for Nuclear Facilties in NEA Member Countries
NEA/CNRA/R(2001)9The Effectiveness of Licensees in Inspecting the Management of Safety
NEA/CNRA/R(2001)8Final Draft report Status Report on Regulatory Inspection Philosophy, Inspection Organisation and Inspection Practices - Working Group on Inspection Practices ( WGIP)
NEA/CNRA/R(2001)7The Effectiveness of Nuclear Regulatory Inspection (Working Group on Inspection Practices)
NEA/CNRA/R(2001)6Inspection of Maintenance on safety Systems During NPP Operation
NEA/CNRA/R(2001)5Regulatory Inspection Activities Related to Radiation protection, Long Shutdowns and Subsequent restarts, and the use of Objective Indicators in Evaluating the performance of plants - USA 15-17 May 2001
NEA/CNRA/R(2001)4Regulatory Inspection Activities related to Radiation Protection, Long Shutdowns and Subsequent restards, and the Use of Objective Indicators in Evaluating the performance of Plants - USA 15-17 May 2001
NEA/CNRA/R(2001)3Improving Regulatory Effectiveness
NEA/CNRA/R(2001)2Regulatory Aspects of Life Extension and Upgrading of NPPs - CNRA Special Issue's Meeting 2000 to the Questionnaire
NEA/CNRA/R(2001)1Regulatory Aspects of Life Extension and Upgrading of NPPs - CNRA Special Issue's Meeting 2000 Report
NEA/CNRA/R(2000)3The Strategic Plan for the Committee on Nuclear Regulatory Activities
NEA/CNRA/R(2000)2Practices for Regulatory Inspection Activities - Working Group on Inspection Practices (WGIP)
NEA/CNRA/R(2000)1Workshop on Assuring Nuclear Safety Competence into the 21st Century - Summary and Conclusions - Budapest, Hungary 12-14 October 1999 -
NEA/CNRA/R(1999)4Regulatory Practices for Decommissioning of Nuclear Facilities with special regard of Regulatory Inspection Practices
NEA/CNRA/R(1999)3Proceedings of the international workshop on the impact of the year 2000 on Nuclear Industry Ottawa 08-10/02/1999
NEA/CNRA/R(1999)2Regulatory Inspection Activities related to Older Operating NPPs,Risk Evaluation and Licensee Resource Commitment - Workshop Proceedings - Prague, Czech Republic 8-11 June 1998 -
NEA/CNRA/R(1999)1Regulatory Aspects of Ageing Reactors -CNRA Special Issue Meeting June 1998 -
NEA/CNRA/R(1998)3Performance Indicators and Combining Assessments to Evaluate the Safety Performance of Licensees, 1998.
NEA/CNRA/R(1998)2Inspection of Licensee Activities in Emergency Planning, 1998.
NEA/CNRA/R(1998)1Comparison of the Inspection Practices in Relation to Control Room Operator and Shift Supervisor Licenses, 1998.
NEA/CNRA/R(1997)5Review Procedures and Criteria for Regulatory Applications of PSA, (1997 : CNRA Paris, Special Issues), 1998.
NEA/CNRA/R(1997)4Regulatory Inspection Practices on Fuel Elements and Core Lay-Out at Nuclear Power Plants, 1998.
NEA/CNRA/R(1997)3Status Report on Inspection Philosophy, Inspection Organisation and Inspection Practices, 1997.
Also referenced as: OCDE/GD(97)140
NEA/CNRA/R(1997)2Licensing of Computer-Based Systems Important to Safety - Workshop and CNRA Special Issues Meeting on Technical Support, (1996 : CNRA Paris, Special Issues), 1997.
Also referenced as: OCDE/GD(97)90
NEA/CNRA/R(1997)1Regulatory Inspection Practices related to Inspection Planning, Plant Maintenance and the Assessment of Safety- Proceedings of an International Workshop, (1996: Chester, UK), 1997.
Also referenced as: OCDE/GD(97)62
NEA/CNRA/R(1996)1Proceedings of the CNRA/CSNI Workshop on Steam Generator Tube Integrity in Nuclear Power Plants, (1995: Oak Brook, Illinois), 1997.
Also referenced as: NUREG/CP-0154
NEA/CNRA/R(1995)3Compilation of Responses to Questionnaire on the Evaluation of the Safety Performance of Licensees, 1995.
NEA/CNRA/R(1995)2Regulatory Approaches to PSA - Report on the Survey of National Practices, (1995 : CNRA Paris, Special Issues), 1996.
Also referenced as: OCDE/GD(96)7
NEA/CNRA/R(1995)1Steam generator Tube Integrity Issue in Nuclear Power Plants. Regulatory requirements and experience.
NEA/CNRA/R(1994)5Regulatory Approaches to Severe Accident Issues, (1994 : CNRA Paris, Special Issues).
NEA/CNRA/R(1994)4Proceedings of Workshop on Conduct of Inspections for Plant Modifications, Event Investigation and Operability Decisions. (1994: Helsinki), 1996.
Also referenced as: OCDE/GD(95)14
NEA/CNRA/R(1994)3Status Report on Inspection Philosophy, Inspection Organisation and Inspection Practices, 1994.
Also referenced as: OCDE/GD(95)3
NEA/CNRA/R(1994)2A Review for Regulatory Requirements for Advanced Nuclear Power Plants, 1994.
NEA/CNRA/R(1994)1Inspector Qualification Guidelines, 1994.
NEA/CNRA/R(1992)3Proceedings of the International Workshop on Conduct of Inspections and Inspector Qualifications and Training. (1992: Chattanooga), 1993.
Also referenced as: NUREG/CP-0128
NEA/CNRA/R(1992)2The Periodic Safety Review of Nuclear Power Plants
Also referenced as: IBSN 92-64-13788-2
NEA/CNRA/R(1992)1CNRA Review on Regulatory Approaches to Accident Management of Containment, 1992.
NEA/CNRA/R(1986)1Comparison of regulations and licensing procedures for fuel cycle facilities particularly with regard to external hazards : proceedings of a specialists' meeting (1986 : Salamanca, Spain), 1986.
Also referenced as: CSNI report 134
NEA/CNRA/R(1978)1Regulatory Inspection of Nuclear Power Plants in NEA Member Countries
Also referenced as: CSNI report 36