Published every year, the NEA Annual report includes an overview of NEA's activities and publications produced during the year, as well as the latest developments in nuclear energy sector around the ...
Published date:
20 November 2024
Publié chaque année, le Rapport annuel de l’AEN présente un aperçu des activités et publications de l’AEN pour une année donnée, ainsi que les derniers développements du secteur de l’énergie nucléair...
Published date:
20 November 2024
This handbook makes international guidance on estimating decommissioning costs more accessible by compiling material from two key reports: the International Structure for Decommissioning Costing (ISD...
Published date:
8 February 2024
Publié chaque année, le Rapport annuel de l’AEN présente un aperçu des activités et publications de l’AEN pour une année donnée, ainsi que les derniers développements du secteur de l’énergie nucléair...
Published date:
8 December 2023
Published every year, the NEA Annual report includes an overview of NEA's activities and publications produced during the year, as well as the latest developments in nuclear energy sector around the ...
Published date:
8 December 2023
The number of nuclear reactors approaching decommissioning, or already in the process of decommissioning, is increasing globally. Planning and performing decommissioning and dismantling activities ra...
Published date:
10 June 2022
The OECD Nuclear Energy Agency (NEA) Strategic Plan serves as a guiding instrument that reflects the priorities of its member countries as the Agency addresses evolving needs in the exploration and a...
Published date:
25 January 2022
The OECD Nuclear Energy Agency (NEA) Forum on Stakeholder Confidence (FSC) acts as a centre for informed exchange of knowledge and experience regarding stakeholder interaction and public participatio...
Published date:
20 January 2022
東日本大震災とそれに続く福島第一原子力発電所事故から10年が経ち、多くの教訓が得られたが、まだ多くの課題が残っている。
この報告書は福島第一原子力発電所の現況と、事故後の日本の当局並びに国際社会の対応について報告するもので、事故に起因する多面的な問題を政策決定者と一般市民双方が理解することに役立つであろう。それには、災害復旧努力、損害賠償、原子力安全、原子力規制、放射線防護、廃炉作業、放射性廃棄物...
Published date:
28 July 2021
Much has been learnt in the ten years since the Great Eastern Japan Earthquake and the subsequent accident at the Fukushima Daiichi Nuclear Power Plant, but significant challenges still remain.
This ...
Published date:
3 March 2021
Low-level and very low-level waste represent the vast majority of radioactive waste by volume from decommissioning activity at nuclear facilities around the world, but they are only a small fraction...
Published date:
4 November 2020
This NEA Policy Brief provides a concise outline of the current outlook for final disposal of radioactive waste in NEA member countries. It describes the challenges, context, stakeholders and potenti...
Published date:
30 July 2020
The NEA Annual Report 2019 provides an overview of the status of nuclear power in NEA member countries and illustrative descriptions of the Agency's activities and international joint projects. 2019 ...
Published date:
12 June 2020
The nuclear sector has in recent years been placing increasing attention on the need to better understand variations between cost estimates for the decommissioning of nuclear power plants, as well as...
Published date:
27 May 2019
The brochure provides background information about the NEA.
Published date:
10 September 2018
The transition from an operating nuclear facility to the decommissioning phase is critical in the life cycle of every facility. A number of organisational and technical modifications are needed in or...
Published date:
25 May 2018
Large quantities of materials arising from the decommissioning of nuclear facilities are non-radioactive per se. An additional significant share of materials is of very low-level or low-level radioac...
Published date:
16 August 2017
This Strategic Plan is intended to guide the NEA as it seeks to meet the evolving needs of member countries in the application and exploration of nuclear science and technology. The plan includes an ...
Published date:
22 December 2016
Decommissioning of both commercial and R&D nuclear facilities is expected to increase significantly in the coming years, and the largest of such industrial decommissioning projects could command cons...
Published date:
18 August 2016
Decommissioning of both commercially used and R&D nuclear facilities is expected to increase significantly in the coming years, and the largest of such industrial decommissioning projects could comma...
Published date:
1 June 2015
Peer reviews are a standard co-operative OECD working tool that offer member countries a framework to compare experiences and examine best practices in a host of areas. The OECD Nuclear Energy Agency...
Published date:
8 December 2014
Decommissioning of nuclear facilities and related remedial actions are currently being undertaken around the world to enable sites or parts of sites to be reused for other purposes. Remediation has g...
Published date:
18 August 2014
Nuclear decommissioning activities can greatly benefit from research and development (R&D) projects. This report examines applicable emergent technologies, current research efforts and innovation nee...
Published date:
21 July 2014
Cost estimation for the decommissioning of nuclear facilities can vary considerably in format, content and practice both within and across countries. These differences may have legitimate reasons but...
Published date:
2 March 2012
Die internationalen Erfahrungen der vergangenen 20 Jahre zeigen, dass kerntechnische Anlagen sicher abgebaut und stillgelegt werden können, nachdem die Entscheidung getroffen wurde, den Betrieb zu be...
Published date:
21 September 2010
Experience from decommissioning projects suggests that the decommissioning of nuclear power plants could be made easier if this aspect received greater consideration at the design stage and during op...
Published date:
7 June 2010
This report is based on a study carried out by the NEA Decommissioning Cost Estimation Group (DCEG) on decommissioning cost elements, estimation practices and reporting requirements. Its findings ind...
Published date:
17 May 2010
Experience from decommissioning projects suggests that the decommissioning of nuclear power plants could be made easier if it received greater consideration at the design stage and during the operati...
Published date:
21 April 2010
L’expérience des projets de démantèlement de centrales nucléaires laisse entendre que l’on pourrait simplifier ces opérations si l’on y accordait davantage d’attention au moment de la conception ou p...
Published date:
16 April 2010
La notevole esperienza internazionale acquisita negli ultimi venti anni dimostra che gli impianti nucleari possono essere disattivati e smantellati (decommissioning) in sicurezza alla fine del loro e...
Published date:
3 April 2010
À l’heure actuelle, on observe une variabilité considérable dans le format, le contenu et les pratiques d’estimation des coûts, que ce soit à l’intérieur d’un même pays ou lorsque l’on franchit les f...
Published date:
22 March 2010
Currently, the format, content and practice of cost estimation vary considerably both within and between countries, which makes it very difficult to compare estimates, even for similar types of facil...
Published date:
22 March 2010
Considerable international experience gained over the last 20 years demonstrates that nuclear facilities can be safely dismantled and decommissioned once a decision is made to cease operations and pe...
Published date:
23 October 2009
En radioprotection, on entend par « libération » la décision prise par l'autorité compétente de lever tous les contrôles réglementaires appliqués jusqu'alors aux matériaux et bâtiments radioactifs. C...
Published date:
31 December 2009
The radiological concept of clearance can be defined as the release of radioactive materials or buildings from any further regulatory control applied for radiological protection purposes by the compe...
Published date:
19 November 2008
The removal of fuel from a permanently shutdown nuclear facility eliminates the major source of radiological hazard, a nuclear criticality. Combined with the cessation of operations at high temperatu...
Published date:
25 September 2008
L’enlèvement des matières irradiées et plus particulièrement du combustible à l'issue de l'arrêt définitif d'une installation élimine la source principale de risque radiologique, le risque de critici...
Published date:
25 September 2008
Ce rapport de synthèse sur le Financement du démantèlement : éthique, mise en œuvre, incertitudes a été rédigé en s’appuyant sur la littérature récente et sur les informations présentées lors des réu...
Published date:
28 August 2007
Any long-term radioactive waste management project is likely to last decades to centuries. It requires a physical site and will impact in a variety of ways on the surrounding community over that whol...
Published date:
14 June 2007
Tout projet de gestion de déchets radioactifs à long terme durera vraisemblablement des décennies, voire des siècles. Il nécessitera un site et influera de bien de manières sur la communauté environn...
Published date:
14 June 2007
This status report on Decommissioning Funding: Ethics, Implementation, Uncertainties is based on a review of recent literature and materials presented at NEA meetings in 2003 and 2004, and particular...
Published date:
23 October 2006
Ce rapport de synthèse sur la façon de Choisir des stratégies de démantèlement des installations nucléaires repose sur les points de vue et les informations présentés au cours d’un séminaire organisé...
Published date:
2 October 2006
This status report on Selecting Strategies for the Decommissioning of Nuclear Facilities is based on the viewpoints and materials presented at a seminar held in Tarragona, Spain on 1-4 September 2003...
Published date:
2 October 2006
La libération des sites d’installations nucléaires des contrôles radiologiques est généralement l’une des dernières étapes du déclassement. À ce jour, seul un petit nombre de projets en ont fait l’ob...
Published date:
27 September 2006
Releasing the site of a nuclear installation from radiological control is usually one of the last steps of decommissioning. To date, site release has been practised in a limited number of cases only ...
Published date:
27 September 2006
The release of radioactive materials from regulatory control is subject to release limits which are often based on published recommendations of international organisations, which aim to minimise radi...
Published date:
12 April 2006
Le problème clé dans le démantèlement des installations nucléaires est l’élimination progressive des risques, au moyen d’une série d’actions de décontamination et de déconstruction qui doivent être r...
Published date:
30 December 2005
The key issue in the decommissioning of nuclear facilities is the progressive removal of hazards, by stepwise decontamination and dismantling activities that have to be carried out safely and within ...
Published date:
30 December 2005
Une des préoccupations majeures exprimée dans la production d'éléctricité d'origine nucléaire est que le démantèlement (déconstruction à un niveau donné) d'installations en fine de vie représente un ...
Published date:
14 October 2005
Il presente rapporto, avente finalità di ampia divulgazione, contiene una sintetica panoramica delle problematiche associate alla disattivazione e allo smantellamento delle intallazioni nucleari ne P...
Published date:
30 September 2004