These proceedings cover the 9th International Workshop held by the WGIP on regulatory inspection. THe focus of this workshop was regulatory inspection activities in 3 main areas:
This appendix supports the proceedings of the 10th International Workshop held by WGIP on regulatory inspection activities [NEA/CNRA/R(2010)5]. The workshop was hosted by the ministry of Housing, Spa...
The NEA Committee on Nuclear Regulatory Activities (CNRA) believes that an essential factor in ensuring the safety of nuclear installations is the continuing exchange and analysis of technical inform...
The NEA Committee on Nuclear Regulatory Activities (CNRA) authorised the formation of a task group in June 2011 to identify measures to enhance the integrity of the supply chain by minimising the inc...
These proceedings cover the 12th International Workshop held by WGIP on regulatory inspection activities. This workshop, which is the twelfth in a series, along with many other activities performed b...
These proceedings cover the 13th International Nuclear Regulatory Inspection Workshop held by WGIP on regulatory inspection activities. This workshop, which is the 13th in a series, along with many o...
This documents provides answers to the questionnaire used as input for the 14th WGIP Workshop held by the WGIP in Heidelberg (Germany) on 8-12 April 2018.
The OECD Nuclear Energy Agency (NEA) Committee on the Safety of Nuclear Installations (CSNI) Working Group on Fuel Cycle Safety (WGFCS) held an international workshop on Operational and Regulatory As...
The report presents information on regulatory inspection activities with respect to emergency planning in NEA Member countries. The focus of the report is on the third section. It reviews the similar...
The following inspector qualification guideline has been developed for guidance of qualification of a new inspector recruited to the regulatory body. This guideline has been developed for helping the...
This report, conducted by the Working Group of Inspection Practices, provides a brief description of the different inspection practices of several member countries within OECD. It presents a framewor...
In 1995 the WGIP issued Status Report on Inspection Philosophy, Inspection Organisation and Inspection Practices, NEA/CNRA/R(94)3, OCDE/GD(95)3. Included was information on the regulatory bodies in 1...
The basic description of the reactor core of a nuclear power plant (NPP) is an important part of the Safety Analysis Report in all countries. Due to increased interest by regulatory authorities in th...
This report presents a comparison of inspection practices in participating OECD countries relating to control room operator and shift supervisor licenses. Key questions for this comparison were ”What...
As a follow-up to the 1995 document on Compilation of Responses to a Questionnaire on the Evaluation of the Safety Performance of Licensees, WGIP members identified several issues where additional in...
These commandable practices are extracts from the topcs, which were discussed by the WGIP and were thought to ber reference for Member countries. These are neither international standards nor guideli...
In many countries the industrial activities for the decommissioning of shut down nuclear facilities have increased within the last ten years and are constantly increasing as older facilities retire a...
Based on a proposal made by the Japanese delegation, WGIP with the approval of CNRA began a task on the Inspection of Maintenance on Safety Systems during Operation of NPPs is 1999. Response to a sur...
In late 1998 the Committee on Nuclear Regulatory Activities agreed that the Working Group on Inspection Practices [WGIP] should discuss the subject of effectiveness of regulatory inspections and prod...