FIST/4DBA1, BWR/4-218 Simulated Double-Ended Large Break Test
FIST/6IB1, BWR/6 System Responses to Intermediate Break in Recirculation Suction Line LINE
FIST/6MSB1, BWR/6 Main Steamline Double-Ended Break Test
FIST/6PMC1, BWR/6-128 Isolation Valve (MSIV) Closure without Power Scram
FIST/6SB1, BWR/6 Simulated Recirculation Line Break
FIST/6SB2C, BWR/6 Recirculation Suction Line Break Test
FIST/T1QUV, Simulated Failure to Maintain Water Level in BWR/6-218
FIST/T23C, Simulated Failure to Maintain Water Level in BWR/6-218
BWR Full Integral Simulation Test (FIST) Phase I Test Results (NUREG/CR-3711)
BWR Full Integral Simulation Test (FIST) Phase II Test Results and TRAC-BWR Model Qualification (NUREG/CR-4128)