To submit a request, click below on the link of the version you wish to order.
Only liaison officers are authorised to submit online requests. Rules for requesters are
available here.
Two Bundle Loop facility. Volume scaling ratio = 1:328. Height ratio = 1:1. The facilities include the following to simulate a BWR system: pressure vessel, main steam system, feedwater, recirculation, ECCS, ADS, break line, utility system, power supply and instrumentation system. The pressure vessel has two heated simulated fuel assemblies.
Small break in recirculation line. The break area and initial power were 3.4% DBA and 4 and 6 MW respectively. Single failure of the HPCS was assumed for the ECCS network and operation of LPCS plus 3LPCI plus ADS was simulated.
Channel and bypass axial flow, void distribution, core heat transfer, quench front propagation, separator behavior, guide tube and lower plenum flashing, and both natural circulation and mixture level in core and downcomer.
- Experimental Data Report for TBL-2, Small Break Test Run-311
Tokyo Electric Power Co., Inc. (no report number)
- TBL Run-311, Magnetic Tape and Data Description
Tokyo Electric Power Co., Inc. (no report number)